1
2
3
4
5
6
7
8
9
10
A
B
C
D
E
F
1000
For Australian commercial fit-outs

Hours of fire drafting, done in minutes.

Fire services layouts and the full CFSP pack for commercial fit-outs, drafted from the architect's PDFs. You review, edit and sign.

YourFire
Jobs
New job
Level 3 fit-out
1Sheets
2Standards
3Work area
4Existing
5Rooms
6Layout
7Documents
8Issue
Layout
Next: Documents
Open officeMeetingBoardroomKitchenStoreCommsReceptionZ1Z2FIP3030220031003100140033801800310031001800
Checks3010
Sprinkler spacing
Open office, fixed
Detector off supply air
Meeting, fixed
SP14 to SP13, 1400
Min 1800, fixed
RunsTake-off
Room outlines
Detection loop86 m
Warning circuit54 m
2 zones, isolator where the loop enters each
SP14Breaks 1 rule
1400 to SP13, min 1800 mmAS 2118.1 sprinkler spacing
SP14Clear of the spacing and wall rules
Drag a device to move it. Checks re-run as you drag.Re-checked, 0
2 Layout A layout drafted from the reflected ceiling plan, with every check passing.
2001
Time saved

A fit-out's fire drafting takes hours by hand. YourFire has the draft ready for review in minutes.

Drafting by hand
1–4 hours
YourFire
Under 15 min
Time to a draft ready for CFSP review, typical commercial fit-out.
3101
How it works, step by step
Scroll to work through the set
01

Sheets

You Upload the architect set, plus the fire engineering report and AFSS if you have them.
YourFire Finds the reflected ceiling plan, reads the scale from the title block and works out whether it's the DA, tender or construction set.
Sheets
12 pages
Next: Standards
A000 Cover
A001 Notes
A100 Existing
A101 Demolition
A200 Floor plan
A201 Furniture
A300 Ceiling plan
Ceiling plan
A400 Elevations
A500 Sections
A600 Details
A700 Joinery
A800 Finishes
Read from the set
Ceiling plan
A300, page 7
Scale
1:100 at A1 from the title block
Set
DA
Tender
Construction
Also uploaded
Fire engineering report
AFSS
02

Standards

You Confirm what the building has.
YourFire Picks the edition each system is designed to from the construction certificate date, and fills in the base building from the AFSS.
Standards
Next: Work area
Construction certificate
Dated 14 March 2026
Sets the editions
Annual fire safety statement
Dated 12 February 2026
Current
SystemBase buildingDesign to
SprinklersAS 2118.1-1999from AFSSAS 2118.1-2017
Smoke detectionAS 1670.1-2004from AFSSAS 1670.1-2018
Occupant warningNonefrom AFSSAS 1670.4-2018
HydrantsAS 2419.1-1994from AFSSAS 2419.1-1994
ExtinguishersAS 2444-2001from AFSSAS 2444-2001
03

Work area

You Outline the fit-out, or keep the whole plan.
YourFire Designs only the rooms inside it, so no device lands outside the works.
Work area
Whole plan
Outline
Next: Existing
Open officeMeetingBoardroomKitchenStoreCommsReceptionLift lobbyOther tenancy
7 rooms inside the works. Nothing designed outside.
04

Existing

You Walk the floor with an iPad and tap in what's already there. On a new build, or where existing documentation is available, skip this step and YourFire designs just the new work areas.
YourFire Takes what you place like an as-built plan, marks each one existing, relocated or removed from the ceiling and scope, then adds only what's short.
Existing
Optional
Next: Rooms
Open officeMeetingBoardroomKitchenStoreCommsReceptionEEEEEEE
Pick a device, tap the plan. One finger pans, pinch zooms.
SavedNo signal? Kept on the iPad
Existing smoke detector
SmokeHeatSpeaker
Remove
Drag to move it
Sprinkler
Smoke
Heat
Speaker
Projector
Extinguisher
Hose reel
Hydrant
05

Rooms

You Check the rooms and confirm the ceilings.
YourFire Outlines every room with its ceiling height. A missing height becomes one RFI.
Rooms
7 rooms found
Next: Layout
Open office2.7 mMeeting2.4 mBoardroom2.4 mKitchen2.7 mStoreExposedCommsNo heightReception2.7 m
Rooms and heights auto-detected
Ceilings
CF-12.7 m
CF-22.4 m
ExposedSoffit 3.9 m
CommsRFI 01
Ceiling height not on the drawings
06

Layout

You Review the layout and drag anything you'd move.
YourFire Places every device by fixed rules, checks each one, fixes what it can, and re-checks live as you drag.
Layout
Next: Documents
Open officeMeetingBoardroomKitchenStoreCommsReceptionZ1Z2FIP3030220031003100140033801800310031001800
SP14Breaks 1 rule
1400 to SP13, min 1800 mmAS 2118.1 sprinkler spacing
SP14Clear of the spacing and wall rules
Re-checked, 0
Checks3010
Sprinkler spacing
Open office, fixed
Detector off supply air
Meeting, fixed
SP14 to SP13, 1400
Min 1800, fixed
RunsTake-off
Room outlines
Detection loop86 m
Warning circuit54 m
2 zones, isolator where the loop enters each
07

Documents

You Read, edit any line, then sign.
YourFire Writes the FER matrix, RFIs, s74 letter, compliance basis, schedule, design certificate and quantities. Every word is editable and your edits survive a redesign.
Documents
Read
Edit
Sign
FER compliance matrix
RFI register
Pre-issue checks
Design basis
Compliance basis
Section 74 letter
Fire safety schedule
Design certificate
Quantities
Sprinklers
Compliance basis

The tenancy is served by the base building sprinkler system. New work in the fit-out is designed to AS 2118.1-2017, the edition current at the construction certificate date.

Existing heads above the new ceiling are retained.Existing heads above the new ceiling are replaced with fast response heads, as the fire engineering report requires.
Edited

Spacing and coverage values come from AS 2118.1. Each one is tied to its clause in the schedule below.

Your edits survive a redesign
08

Issue

You Tick what you want and download.
YourFire Exports the A1 sheets, the pack, takeoffs and QTDs in PDF, Word, DXF and Excel, named and revisioned.
Issue
Rev A
Drawings
FS-100SprinklersPDF, DXF
FS-200Detection and warningPDF, DXF
FS-300Extinguishers and hose reelsPDF, DXF
FS-400Hydrant coveragePDF, DXF
CFSP pack
Pack documentsWord, PDF
Quantities
Quantities scheduleExcel
TakeoffsExcel, PDF
QTDsExcel
Named and revisioned
Download
Downloaded
FS-100_APDF
FS-100_ADXF
FS-200_APDF
FS-200_ADXF
FS-300_APDF
FS-400_APDF
CFSP-pack_ADOCX
CFSP-pack_APDF
Quantities_AXLSX
Takeoffs_AXLSX
Takeoffs_APDF
QTD_AXLSX
4200
What you get

Everything you'd issue, drafted and editable before you sign.

The issue12 sheets and documents from one job, issued once your CFSP signs.
1 / 12
DRAWING REGISTERNO.TITLEREVFS-000Cover, register, legend and notesAFS-100Fire services layoutAFS-101Sprinkler setout, dimensionedAFS-102Detection and warning setoutAFH-100Fire hydrant coverageAABBREVIATIONSAFLAbove finished floor levelBOWSBuilding occupant warning systemCFSPCompetent fire safety practitionerCHCeiling heightDTSDeemed-to-satisfyFERFire engineering reportFIPFire indicator panelNCCNational Construction CodeOHOrdinary hazardRCPReflected ceiling planRFIRequest for informationKEY PLANGENERAL NOTES1.2.3.4.5.DESIGN CRITERIAREVISIONSAIssued for reviewLEGENDSprinkler, pendentSmoke detectorBOWS speakerPortable extinguisherFire hydrantGENERAL NOTES1.2.3.4.ISSUED FOR CONSTRUCTIONPROJECTLevel 3 fit-outDRAWINGCover sheetSTATUSSigned by CFSPSHEETFS-000REVA
FS-000Cover, register, legend and notesA1 · PDF
Open officeMeetingBoardroomKitchenStoreCommsReceptionB1FS-100FIRE SERVICES LAYOUTSCALE 1:100 AT A1DESIGN CRITERIAREVISIONSAIssued for reviewBConstruction set changes, cloudedLEGENDSprinkler, pendentSmoke detectorBOWS speakerPortable extinguisherGENERAL NOTES1.2.3.4.5.6.7.YourFirePROJECTLevel 3 fit-outDRAWINGFire services layoutSTATUSSigned by CFSPSHEETFS-100REVB
FS-100Fire services layoutA1 · PDF, DXF
Open officeMeetingBoardroomKitchenStoreCommsReception12004800240014003100310017502250200015001FS-101SPRINKLER SETOUT, DIMENSIONEDSCALE 1:100 AT A1DESIGN CRITERIAREVISIONSAIssued for reviewLEGENDSprinkler, pendentSetout dimension (mm)GENERAL NOTES1.2.3.4.5.ISSUED FOR CONSTRUCTIONPROJECTLevel 3 fit-outDRAWINGSprinkler setout, dimensionedSTATUSSigned by CFSPSHEETFS-101REVA
FS-101Sprinkler setout, dimensionedA1 · PDF, DXF
Open officeMeetingBoardroomKitchenStoreCommsReception24004800480029503100350013004500300015001FS-102DETECTION AND WARNING SETOUTSCALE 1:100 AT A1DESIGN CRITERIAREVISIONSAIssued for reviewLEGENDSmoke detectorBOWS speakerSetout dimension (mm)GENERAL NOTES1.2.3.4.5.ISSUED FOR CONSTRUCTIONPROJECTLevel 3 fit-outDRAWINGDetection and warning setoutSTATUSSigned by CFSPSHEETFS-102REVA
FS-102Detection and warning setoutA1 · PDF, DXF
Open officeMeetingBoardroomKitchenStoreCommsReceptionH148 m57 m1FH-100FIRE HYDRANT COVERAGESCALE 1:100 AT A1DESIGN CRITERIAREVISIONSAIssued for reviewLEGENDFire hydrantHydrant coverage, 60 m hose pathGENERAL NOTES1.2.3.4.5.ISSUED FOR CONSTRUCTIONPROJECTLevel 3 fit-outDRAWINGFire hydrant coverageSTATUSSigned by CFSPSHEETFH-100REVA
FH-100Fire hydrant coverageA1 · PDF, DXF
QS-01 · Rev AISSUED FOR CONSTRUCTIONQuantities scheduleLevel 3 fit-outMeasured from FS-100 to FS-102. Lengths include 10% for drops and offsets.ITEMDESCRIPTIONUNITQTYFS-01Sprinkler, pendent, 68°C quick responseno.12FS-02Sprinkler pipe 25 mm, black steelm86FS-03Sprinkler pipe 32 mm, black steelm54FD-01Smoke detector, photoelectricno.9FD-02Detection cable, 2 core FRm118FW-01BOWS speaker, ceilingno.4FW-02Warning cable, 2 core FRm74FE-01Portable extinguisher, 2.0 kg CO2no.1FE-02Extinguisher sign and locationno.1QS-01 Quantities schedulePage 1 of 1
QS-01Quantities schedule, the take-offExcel, PDF
RP-01 · Rev AISSUED FOR CONSTRUCTIONFER compliance matrixLevel 3 fit-outCLAUSEREQUIREMENTDESIGN RESPONSESTATUSFER 4.1CompliesFER 4.2CompliesFER 5.3RFIFER 6.1CompliesFER 6.4CompliesFER 7.2OpenFER 8.1CompliesFER 8.3CompliesRP-01 FER compliance matrixPage 1 of 2
RP-01FER compliance matrixWord, PDF
RF-01 · Rev AISSUED FOR CONSTRUCTIONRequest for information registerLevel 3 fit-outNO.SUBJECTRAISEDSTATUSRFI 01Ceiling height, Comms room05 NovOpenRFI 02Current annual fire safety statement05 NovOpenRFI 03Sprinkler valve set location05 NovAnsweredRFI 04Bulkhead depth, Reception05 NovOpenAssumptions until answeredRF-01 Request for information registerPage 1 of 1
RF-01Request for information registerWord, PDF
LT-01 · Rev AISSUED FOR CONSTRUCTIONObjection under section 74Level 3 fit-outTo the certifierNon-compliance and the reason for itTable A. Relevant fire safety systemsSYSTEMSTANDARDAFFECTEDSprinklersAS 2118.1NoDetectionAS 1670.1YesBOWSAS 1670.4NoPractitioner who endorsed the plansNameAccreditation no.SignatureDatePractitioner who endorses this objectionNameSignatureLT-01 Objection under section 74Page 1 of 2
LT-01Objection under section 74Word, PDF
RP-03 · Rev AISSUED FOR CONSTRUCTIONCompliance basisLevel 3 fit-outThe edition each system is designed to, and why.SYSTEMSTANDARDEDITIONWHYSprinklersAS 2118.12017DetectionAS 1670.12018BOWSAS 1670.42018ExtinguishersAS 24442001HydrantsAS 2419.12005Hose reelsAS 24412005Clause referencesRP-03 Compliance basisPage 1 of 2
RP-03Compliance basisWord, PDF
SC-01 · Rev AISSUED FOR CONSTRUCTIONSchedule of fire safety measuresLevel 3 fit-outNO.FIRE SAFETY MEASURESTANDARD OF PERFORMANCESTATUS1Automatic fire detection and alarm systemAS 1670.1New2Automatic fire sprinkler systemAS 2118.1Existing3Building occupant warning systemAS 1670.4New4Emergency lightingAS 2293.1Existing5Exit signsAS 2293.1Existing6Fire hydrant systemAS 2419.1Existing7Portable fire extinguishersAS 2444NewSC-01 Schedule of fire safety measuresPage 1 of 1
SC-01Schedule of fire safety measuresWord, PDF
CT-01 · Rev AISSUED FOR CONSTRUCTIONDesign certificateLevel 3 fit-outFire services design, Level 3 fit-outMEASURESTANDARD OF PERFORMANCEAutomatic fire sprinkler systemAS 2118.1Fire detection and alarmAS 1670.1Building occupant warningAS 1670.4Portable fire extinguishersAS 2444Fire services designerNameCompanyPhoneEmailDateCompetent fire safety practitionerNameAccreditation no.SignatureCT-01 Design certificatePage 1 of 1
CT-01Design certificateWord, PDF

The drawing set

A1, PDF and DXF
01 Sprinkler layout to AS 2118.1, branch lines sized indicatively and flagged for full calculation.
02 Smoke and heat detection to AS 1670.1. BOWS speakers to AS 1670.4.
03 Extinguishers to AS 2444. Hose reel and hydrant coverage by walking path.
04 A full title block, a legend of only the symbols used, device tags, general notes and design criteria on every sheet.
05 Revisions with clouds round what changed.

The CFSP pack

Word and PDF, editable before issue
01 FER compliance matrix
02 RFI register
03 Pre-issue checks
04 Design basis and override log
05 Compliance basis for the certifier
06 Section 74 objection letter
07 Base building records request and assumed base building, when the AFSS is missing or old
08 Schedule of fire safety measures
09 Design certificate, filled and ready to sign
10 Quantities schedule, also in Excel
11 Device takeoffs and QTDs, in Excel
5250
RFI register

Three missing inputs hold jobs up for days. YourFire keeps working without them.

No.Holding the job upWhat YourFire doesStatus
01

No current annual fire safety statement

Reads the AFSS from a PDF, scan or photo, and drafts the request letter if it's missing or out of date.

Open
Request drafted
02

Only DA or tender drawings

Start on DA or tender drawings, and YourFire clouds what changed when the construction set lands.

Open
Job started
03

Certifier pushback on the standards

The compliance basis cites the edition and clause behind every value.

Open
Clause cited
6900
General notes
1.

Layouts and checks are worked out by fixed rules and maths, every value tied to its clause and the edition it comes from. AI only reads documents and writes text.

2.

Every set is a draft. A CFSP reviews and signs before anything is issued.

3.

Drawings are stored in Sydney, and each firm sees only its own jobs.

Send us a closed job. We'll draft it in minutes and put it beside the set you issued.

Book a demo
Reviewed and signed by the CFSP
Date